A. Whenever a developer installs or causes to be installed any utility line within the town, or connects to existing facilities within the town, the developer must furnish the town with four Mylar copies of a drawing that shows the exact location of such utility lines as soon as practicable after installation is complete, and before acceptance of any utility line.

B. The town engineer must verify the accuracy of the drawings.

C. Compliance with this requirement is a condition of the continued validity of the permit authorizing the development. [Ord. 378 § 2 (Exh. 1), 1999.]