Skip to main content
Loading…
This section is included in your selections.

A. Before any new sewer system or water system pipes are installed, a developer must provide plans to the town engineer for review.

B. A licensed engineer must prepare the plans provided to the town engineer for review. [Ord. 378 § 2 (Exh. 1), 1999.]