Chapter 15.76 UTILITIES
This chapter is included in your selections.
Sections:
- Article 1. General
- Article 2. Sewer
- 15.76.060 Construction standards and specifications.
- 15.76.070 Serving lots with sewage disposal systems.
- 15.76.080 Sewage disposal facilities required before construction is complete.
- 15.76.090 Compliance with standards.
- 15.76.100 Conveyance of facilities to the town.
- 15.76.110 Side sewer permits required.
- 15.76.120 Costs of side sewer and step system borne by owner.
- 15.76.130 Side sewer permitting process.
- 15.76.140 Side sewer contractor registration required.
- 15.76.150 Each side sewer to have individual side sewer connection, unless exception granted.
- 15.76.160 Protection of excavations – Restoration of public property.
- Article 3. Water
- 15.76.170 Construction standards and specifications.
- 15.76.180 Water system required.
- 15.76.190 Compliance with standards.
- 15.76.200 Conveyance of facilities to the town.
- 15.76.210 Licensed contractor required to make connections.
- 15.76.220 Costs borne by owner.
- 15.76.230 Make application to connect to town water system.
- 15.76.240 Each lot to have individual water connection, unless exception granted.
- 15.76.250 Protection of excavations – Restoration of public property.
- Article 4. Other Utilities